As the new year approaches, now’s the ideal time to think ahead and make sure your 2026 projects start on solid ground.

At Tradesales, we design and deliver dependable site infrastructure built for Australia’s toughest conditions from heavy-duty storage and workshop equipment to fully containerised, relocatable site solutions.

Why Planning Early Matters

  • Shorter lead times & guaranteed delivery — Ordering ahead means you get ahead of the rush when projects ramp up

  • Custom builds tailored to your needs — Whether you need specialised storage, off-grid utilities or modular site infrastructure, early planning lets us build for your exact requirements

  • Local, end-to-end support — With offices across Perth, Queensland and Melbourne, Tradesales offers local support wherever your site is

  • Mine-spec, compliant solutions — All equipment and infrastructure are designed to meet compliance and safety requirements for demanding industrial and mining environments

What Tradesales Offers

  • Heavy-duty storage systems — Robust cabinets, lockers, and secure storage, built to withstand harsh environments and heavy use

  • Workshop and site equipment — From tool storage and workbenches to certified shelving, we have the gear to make your worksite efficient and durable

  • Relocatable site solutions — Containerised offices, crib rooms, ablution blocks, emergency shelters, and more — ready to drop on-site

  • Off-grid and remote-ready systems — For sites far from infrastructure: solar-ready ablution blocks, battery-backed power and water systems, waste management, and other self-contained units

The Advantage of Early Planning

When you plan for 2026 now, you:

  1. Lock in manufacturing and delivery slots — avoiding delays when demand spikes

  2. Get fully customised infrastructure that matches your project needs (size, environment, usage)

  3. Minimise risk — compliant, mine-spec solutions reduce safety hazards and compliance headaches

  4. Retain flexibility — modular and relocatable systems can evolve with your project or be redeployed to another site if needed

If you have a 2026 project in the pipeline or are thinking about potential future sites now is the time to reach out. Chat with our team today to discuss timelines, delivery windows and how we can tailor a solution that works for you.